// The Board / Port Arthur LNG

Jobsite · Port Arthur, TX● Underway

Port Arthur LNG

LNG export terminal. Phase 1 (Trains 1–2) under construction since the March 2023 go-ahead; Phase 2 (Trains 3–4) contracted to Bechtel, doubling the plant.1,2

Beaumont–Port Arthur
🔔 Follow this job
~5,000 (Phase 1)Hands at peak1
2031Runs to3
2Outfits listed

Anybody on the job can vouch for anybody they overlapped, whichever outfit signs their check.

// How to get on

  • Bechtel holds a public job fair Thursday, Oct 22, 2026, 10am–1pm, at the Beaumont Workforce Center, 510 Park Street, Beaumont.4
  • Lamar State College Port Arthur's Ironworker NCCER course is free for those who qualify and earns NCCER Core plus Ironworker 1 and 2. Top graduates are offered a Bechtel apprenticeship on Port Arthur LNG.5
  • Lamar State College Port Arthur's Pipefitter NCCER course runs 7 weeks, weekdays 8 to 5, unpaid, for $3,500 (tuition help for those who qualify), and earns NCCER Core plus Pipefitter 1 and 2.6

On the job

2 outfits
  • BechtelGeneral contractor→
  • Sempra InfrastructureOwner, own crews→

An outfit is here because it holds a site on this job, added from a published source or by a hand on the job, and checked by a moderator.

Your outfit not listed? Punch in to add it.

Working Port Arthur LNG?

Nobody has put this job on their card yet. Be the first, and the people you work beside can vouch for you.

  1. Put it on your card. Add Port Arthur LNG and your outfit, so coworkers here can vouch you. Punch in to make your card
  2. Follow it with the button above: a notice whenever a job goes up here.
  3. Send it to your crew. The more of the job is on here, the more every vouch is worth.

About the site

Anyone on the job
4 quick questions, one tap each
How's the parking / walk to the gate?Shown once 3 people answer.
How long to get badged and through orientation?Shown once 3 people answer.
What time does the day start?Shown once 3 people answer.
Restrooms, water and shade kept up?Shown once 10 people answer, so no one's answer can be worked out.
Suggest a question →Something specific about this job? Ask the crew below.

Where the job's at

Sourced
  • 2031Train 4 due. Construction work winds down.3
  • 2030Train 3 due.3
  • 2024Phase 2 (Trains 3–4) contracted to Bechtel.2
  • MAR 2023Go-ahead given; construction starts on Phase 1 (Trains 1–2).1

Ask the crew

Questions go up once a moderator reads them. Only people vouched on this job can answer, and answers never show a name.

    Punch in to ask the crew something.

    • About the employer, not the place? Ask on their company page: Bechtel · Sempra Infrastructure
    • For every jobsite, like per diem or hours? Suggest a question above.

    Sources

    1. Port Arthur LNG · Bechtel
    2. Bechtel wins second phase of Port Arthur LNG · Construction Dive
    3. Sempra advances Port Arthur LNG Phase 2 with FID, $14 billion investment · Oil & Gas Journal
    4. Job Fairs · Workforce Solutions Southeast Texas
    5. Ironworker NCCER · Lamar State College Port Arthur
    6. Pipefitter NCCER · Lamar State College Port Arthur
    Shift ChangeLaydown YardThe BoardMuster PointFeedbackAll areas
    Real people, real work

    Independently owned and operated. Not run by any employer, union, or labor organization. Companies can claim their page and post jobs; they can never edit or remove what workers write. Guidelines · Terms · Privacy · © 2026 Time and a Half