The jobs
Where Zachry Construction is working. Each card links to the jobsite page, where you can see who else is on it.
Fort Worth, TX · Dallas–Fort Worth
I-30 Widening, Linkcrest Drive to I-820
Zachry Construction's role: General contractor
TxDOT is widening three miles of I-30 between Linkcrest Drive and I-820 in west Fort Worth from two main lanes each way to three, with the Spur 580 interchange and frontage roads. Zachry Construction is building it.1,2
Zachry is building a new chlorine and sulfur dioxide containment building, a supplemental chlorine storage building and pump stations at the Trinity River Authority's Central Regional Wastewater System plant, about $108 million.3,4
From crews with the job on their card, never anyone's exact rate.
How this works
One report per person per job. A range shows once 5 people share a trade: the middle of what they reported, rounded to $2, so no one's exact rate shows. “Vouched” means a coworker who was there confirmed the job.
One tap each. Facts about the job show once 3 people answer; opinions about Zachry Construction stay hidden until 10, so no one's answer can be worked out.
7 quick questions, one tap each
About Zachry overallWould you work for Zachry again?Shown once 10 people answer, so no one's answer can be worked out.
About I-30 Widening, Linkcrest Drive to I-820What's the schedule?Shown once 3 people answer.
Reviews
Nobody's reviewed Zachry Construction yet. If you've worked here, you'd be first. Punch in to post.
UnclaimedNobody from Zachry Construction manages this page. Reviews here are written by tradespeople, and claiming never changes one.Work here? Claim it