Company · TX

Zachry Construction

Heavy civil highway and infrastructure contractor · General contractor · Locations: TX

35 jobs on the Board →

Found on their own postings and checked by Time & a Half. You apply on their posting.

The jobs

Where Zachry Construction is working. Each card links to the jobsite page, where you can see who else is on it.

Fort Worth, TX · Dallas–Fort Worth

I-30 Widening, Linkcrest Drive to I-820

Zachry Construction's role: General contractor

TxDOT is widening three miles of I-30 between Linkcrest Drive and I-820 in west Fort Worth from two main lanes each way to three, with the Spur 580 interchange and frontage roads. Zachry Construction is building it.1,2

2024 start2▲ now2030
Jobsite page →
Dallas, TX · Dallas–Fort Worth

TRA Central Regional Wastewater Plant Upgrades

Zachry Construction's role: General contractor

Zachry is building a new chlorine and sulfur dioxide containment building, a supplemental chlorine storage building and pump stations at the Trinity River Authority's Central Regional Wastewater System plant, about $108 million.3,4

2026 start4▲ now2029
Jobsite page →

What it pays

From crews with the job on their card, never anyone's exact rate.

How this works

One report per person per job. A range shows once 5 people share a trade: the middle of what they reported, rounded to $2, so no one's exact rate shows. “Vouched” means a coworker who was there confirmed the job.

TradeBase ratePer diemSchedule

Nobody has shared pay at Zachry yet.

Punch in to share what Zachry paid you →

Quick answers

One tap each. Facts about the job show once 3 people answer; opinions about Zachry Construction stay hidden until 10, so no one's answer can be worked out.

7 quick questions, one tap each
About Zachry overallWould you work for Zachry again?Shown once 10 people answer, so no one's answer can be worked out.
About I-30 Widening, Linkcrest Drive to I-820What's the schedule?Shown once 3 people answer.

Reviews

Nobody's reviewed Zachry Construction yet. If you've worked here, you'd be first. Punch in to post.
UnclaimedNobody from Zachry Construction manages this page. Reviews here are written by tradespeople, and claiming never changes one.Work here? Claim it

// Sources

  1. Keep 20-30 Moving: FAQ · TxDOT
  2. I-30 Corridor Project · TxDOT
  3. Zachry breaks ground on $108M Texas water project · Construction Dive
  4. Zachry advances Trinity River Authority wastewater infrastructure project in Dallas · Water Online

Welcome to Time & a Half

Skilled trades are becoming the most valuable resource on complex jobs: the ones who get them built right and on time. Time & a Half has been created to keep that standard, by the trades, for the trades.

It's brand new. It grows in whatever direction the people using it take it: what you ask for is what gets built next.

Free, and independent: not run by any employer, union, contractor or recruiter.