Acero

Structural steel erection. · Trade contractor · Locations: TX
Ironwork / Structural Steel
UnclaimedNobody from Acero manages this page. Reviews here are written by tradespeople, and claiming never changes one.Work here? Claim it

The job

Where Acero is working. Each card links to the jobsite page, where you can see who else is on it.

DFW Airport, TX · Dallas–Fort Worth

DFW Airport – Terminal C

Acero's role: Trade contractor

Full rebuild of DFW's busiest terminal while it stays open: more than 400 columns out, a raised roof, and a new modular pier of gates, in three phases. Design-build by the AAA joint venture (Austin Commercial, Azteca Enterprises, Alpha & Omega), about $3 billion.1,2

2024 start1▲ now2030
Jobsite page →

What it pays

Reported by vouched members with the job on their card, one report each. A range shows once 5 people report a trade: the middle of the reports, rounded, so no one's exact rate shows.

TradeBase ratePer diemSchedule

Nobody has reported pay at Acero yet.

Punch in to add what Acero paid you →

Quick answers

One tap each. Facts about the job show once 3 people answer; opinions about Acero stay hidden until 10, so no one's answer can be worked out.

0 of 7 answered
DFW Airport – Terminal C
About Acero overallWould you work for Acero again?Shown once 10 people answer, so no one's answer can be worked out.
About DFW Airport – Terminal CWhat's the schedule?Shown once 3 people answer.
About DFW Airport – Terminal CPer diem?Shown once 3 people answer.
About DFW Airport – Terminal CWhere did you stay?Shown once 3 people answer.
About Acero overallOT paid on time?Shown once 10 people answer, so no one's answer can be worked out.
About Acero overallPay schedule?Shown once 3 people answer.
About Acero overallSite safety culture?Shown once 10 people answer, so no one's answer can be worked out.
Nobody's reviewed Acero yet. If you've worked here, you'd be first. Punch in to post.

// Sources

  1. DFW Airport announces start of work on $9B capital plan with Terminal C · DFW Airport
  2. DFW Completes Another 'Megastructure' Module Move for $3B Terminal C · ENR