Company · TX

Austin Bridge & Road

Highway, bridge and paving contractor; part of Austin Industries (Dallas) · Trade contractor · Locations: TX
Heavy Civil / ExcavationConcrete / Cement Finishing

16 jobs on the Board →

Found on their own postings and checked by Time & a Half. You apply on their posting.

The jobs

Where Austin Bridge & Road is working. Each card links to the jobsite page, where you can see who else is on it.

Mesquite, TX · Dallas–Fort Worth

I-635 / US 80 Interchange

Austin Bridge & Road's role: Trade contractor

TxDOT's $540 million rebuild of the I-635/US 80 interchange in Mesquite: widening US 80 and adding continuous frontage roads along I-635 over a 5.45-mile project. Austin Bridge & Road is the contractor, on the largest single contract in its history.1,2

2025 start2▲ now2029
Jobsite page →
Fort Worth, TX · Dallas–Fort Worth

Southeast Connector

Austin Bridge & Road's role: Trade contractor

Rebuild and widening of about 16 miles of I-20, I-820 and US 287 in southeast Fort Worth, and the interchanges between them. Built by South-Point Constructors, a joint venture of Kiewit and Austin Bridge & Road.3

2023 start3▲ now2028
Jobsite page →

Jobsites

Where the work is. Post counts are deliberately not shown per site — on a small crew that would name the author.
1 completed job

What it pays

From crews with the job on their card, never anyone's exact rate.

How this works

One report per person per job. A range shows once 5 people share a trade: the middle of what they reported, rounded to $2, so no one's exact rate shows. “Vouched” means a coworker who was there confirmed the job.

TradeBase ratePer diemSchedule

Nobody has shared pay at Austin yet.

Punch in to share what Austin paid you →

Quick answers

One tap each. Facts about the job show once 3 people answer; opinions about Austin Bridge & Road stay hidden until 10, so no one's answer can be worked out.

7 quick questions, one tap each
About Austin overallWould you work for Austin again?Shown once 10 people answer, so no one's answer can be worked out.
About I-635 / US 80 InterchangeWhat's the schedule?Shown once 3 people answer.

Reviews

Nobody's reviewed Austin Bridge & Road yet. If you've worked here, you'd be first. Punch in to post.
UnclaimedNobody from Austin Bridge & Road manages this page. Reviews here are written by tradespeople, and claiming never changes one.Work here? Claim it

// Sources

  1. Austin Bridge & Road: austin-ind.com · Austin Bridge & Road
  2. I-635/US 80 Interchange Improvement Project fact sheet · TxDOT
  3. Southeast Connector FAQ · TxDOT

Welcome to Time & a Half

Skilled trades are becoming the most valuable resource on complex jobs: the ones who get them built right and on time. Time & a Half has been created to keep that standard, by the trades, for the trades.

It's brand new. It grows in whatever direction the people using it take it: what you ask for is what gets built next.

Free, and independent: not run by any employer, union, contractor or recruiter.