DFW Airport, TX · Dallas–Fort Worth
DFW Airport – Terminal F
Turner Construction's role: General contractor
DFW's new sixth terminal: a 15-gate concourse with its own Skylink station, built from prefabricated modules moved into place, plus an expansion of Terminal E. Design-build by the Innovation Next+ joint venture (Archer Western, Turner, Phillips May, H.J. Russell, CARCON).1,3
Rebuild of the Kay Bailey Hutchison Convention Center in downtown Dallas. Construction managed by the Trinity Alliance, a joint venture led by AECOM Hunt and Turner.4,5
From crews with the job on their card, never anyone's exact rate.
How this works
One report per person per job. A range shows once 5 people share a trade: the middle of what they reported, rounded to $2, so no one's exact rate shows. “Vouched” means a coworker who was there confirmed the job.
One tap each. Facts about the job show once 3 people answer; opinions about Turner Construction stay hidden until 10, so no one's answer can be worked out.
7 quick questions, one tap each
About Turner overallWould you work for Turner again?Shown once 10 people answer, so no one's answer can be worked out.
About DFW Airport – Terminal FWhat's the schedule?Shown once 3 people answer.
Reviews
Nobody's reviewed Turner Construction yet. If you've worked here, you'd be first. Punch in to post.
UnclaimedNobody from Turner Construction manages this page. Reviews here are written by tradespeople, and claiming never changes one.Work here? Claim it