By the trades, for the trades
DFW's new sixth terminal: a 15-gate concourse with its own Skylink station, built from prefabricated modules moved into place, plus an expansion of Terminal E. Design-build by the Innovation Next+ joint venture (Archer Western, Turner, Phillips May, H.J. Russell, CARCON).1,3
6 outfits on this job. Everybody here can vouch for everybody else who overlapped them, whichever one signs their cheque.
// Trades
From what the outfits on this job do, not from who has signed up.
// On the job
An outfit is here because it holds a site on this job. Nothing on this page puts one here.
// Where the job's at
Every date here is from a published source; the numbers point to it below.
// Compare outfits on DFW Airport – Terminal F
| Outfit | Schedule | Per diem |
|---|---|---|
| Archer Western Building Group | Not enough yet | Not enough yet |
| Carcon Industries | Not enough yet | Not enough yet |
| H.J. Russell & Company | Not enough yet | Not enough yet |
| Lindamood Demolition | Not enough yet | Not enough yet |
| Phillips May Corporation | Not enough yet | Not enough yet |
| Turner Construction | Not enough yet | Not enough yet |
From members who worked it. Each cell shows once enough people answer.
// About the site
Answered by anybody on the job, whoever they work for.
// Ask the crew on this job
Questions go up once a moderator reads them. Only people vouched on this job can answer, and answers never show a name.
No questions on this job yet.
Punch in to ask the crew something.
// Sources