SATURDAYSAT, OCT 10
Time&A Half
Logged out
Punch In

By the trades, for the trades

Shift ChangeLaydown YardThe BoardMuster Point

// The Board / Dallas North Tollway Extension (US 380 to FM 428)

Jobsite · Prosper, TX● Underway

Dallas North Tollway Extension (US 380 to FM 428)

NTTA's extension of the Dallas North Tollway main lanes about 6 miles north from US 380 to FM 428, through Prosper and Celina, budgeted at about $460 million. Sinacola is the contractor.1,2

Dallas–Fort Worth
🔔 Follow this job
2027Runs to3,2
1Outfit listed

Anybody on the job can vouch for anybody they overlapped, whichever outfit signs their check.

On the job

1 outfit
  • SinacolaTrade contractor · Heavy Civil / Excavation · Concrete / Cement Finishing · listed as “Dallas North Tollway Extension”→

An outfit is here because it holds a site on this job, added from a published source or by a hand on the job, and checked by a moderator.

Your outfit not listed? Punch in to add it.

Working Dallas North Tollway Extension (US 380 to FM 428)?

Nobody has put this job on their card yet. Be the first, and the people you work beside can vouch for you.

  1. Put it on your card. Add Dallas North Tollway Extension (US 380 to FM 428) and your outfit, so coworkers here can vouch you. Punch in to make your card
  2. Follow it with the button above: a notice whenever a job goes up here.
  3. Send it to your crew. The more of the job is on here, the more every vouch is worth.

About the site

Anyone on the job
4 quick questions, one tap each
How's the parking / walk to the gate?Shown once 3 people answer.
How long to get badged and through orientation?Shown once 3 people answer.
What time does the day start?Shown once 3 people answer.
Restrooms, water and shade kept up?Shown once 10 people answer, so no one's answer can be worked out.
Suggest a question →Something specific about this job? Ask the crew below.

Trades

From the outfits
  • Concrete / Cement Finishing
  • Heavy Civil / Excavation

Ask the crew

Questions go up once a moderator reads them. Only people vouched on this job can answer, and answers never show a name.

    Punch in to ask the crew something.

    • About the employer, not the place? Ask on their company page: Sinacola
    • For every jobsite, like per diem or hours? Suggest a question above.

    Sources

    1. Area growth drives need for $460M Dallas North Tollway extension · Community Impact
    2. NTTA Board Approves Dallas North Tollway Extension Contracts · NTTA
    3. Dallas North Tollway (DNT) · NTTA
    Shift ChangeLaydown YardThe BoardMuster PointFeedbackAll areas
    Real people, real work

    Independently owned and operated. Not run by any employer, union, or labor organization. Companies can claim their page and post jobs; they can never edit or remove what workers write. Guidelines · Terms · Privacy · © 2026 Time and a Half