Found on their own postings and checked by Time & a Half. You apply on their posting.
The job
Where Sinacola is working. Each card links to the jobsite page, where you can see who else is on it.
Prosper, TX · Dallas–Fort Worth
Dallas North Tollway Extension (US 380 to FM 428)
Sinacola's role: Trade contractor
NTTA's extension of the Dallas North Tollway main lanes about 6 miles north from US 380 to FM 428, through Prosper and Celina, budgeted at about $460 million. Sinacola is the contractor.1,2
From crews with the job on their card, never anyone's exact rate.
How this works
One report per person per job. A range shows once 5 people share a trade: the middle of what they reported, rounded to $2, so no one's exact rate shows. “Vouched” means a coworker who was there confirmed the job.