Southeast Connector

Fort Worth, TX·Dallas–Fort Worth·Working

Rebuild and widening of about 16 miles of I-20, I-820 and US 287 in southeast Fort Worth, and the interchanges between them. Built by South-Point Constructors, a joint venture of Kiewit and Austin Bridge & Road.1

2 outfits on this job. Everybody here can vouch for everybody else who overlapped them, whichever one signs their cheque.

2028work runs to: about 2 years left1
2trades on the job

// Trades

  • Concrete / Cement Finishing
  • Heavy Civil / Excavation

From what the outfits on this job do, not from who has signed up.

// On the job

An outfit is here because it holds a site on this job. Nothing on this page puts one here.

// Compare outfits on Southeast Connector

OutfitSchedulePer diem
Austin Bridge & RoadNot enough yetNot enough yet
KiewitNot enough yetNot enough yet

From members who worked it. Each cell shows once enough people answer.

// About the site

Answered by anybody on the job, whoever they work for.

0 of 4 answered
How's the parking / walk to the gate?Shown once 3 people answer.
How long to get badged and through orientation?Shown once 3 people answer.
What time does the day start?Shown once 3 people answer.
Restrooms, water and shade kept up?Shown once 10 people answer, so no one's answer can be worked out.

// Ask the crew on this job

Questions go up once a moderator reads them. Only people vouched on this job can answer, and answers never show a name.

No questions on this job yet.

    // Sources

    1. Southeast Connector FAQ · TxDOT